Evaporation Control Floating Cover

The day is coming when the price we pay for water will require us to protect the water we already have. This is already happening in Australia where in some areas the protection of water from evaporation is more cost effective than buying new supplies. As water supplies become increasingly scarce evaporation control on our ponds will become more important. Layfield’s REVOC Evaporation/Algae control cover is an inexpensive option to prevent the loss of precious water from ponds. It is suited to agricultural and raw water storage applications where a low-cost cover is required. All of Layfield’s floating covers will prevent evaporation. Potable water floating covers such as our REVOC Defined Sump and REVOC Cable Tensioned cover prevent the evaporative loss of both water and chlorine.

Contact your local Layfield office to see how an evaporation control cover can work for your pond.

Click Here to Read Hydroprocess 2015 Floating Cover Paper 

close menu
"We were offered Geogrids made overseas from a small distributor, but we declined as their testing were suspect and they had no reputation in the market. We will only work with reputable suppliers like Layfield as their Geogrids perform as per recognized specifications." Kenny, Engineering & Scientific Consultant,

Request For Quote

Tell us a little bit about your needs and we'll get right back to you with specific pricing. 

Get a full introduction to Layfield services with a Lunch & Learn session.
Contact us today 

About Environmental Containment

Layfield Environmental Containment is a vertically integrated company involved in the manufacturing, fabrication, installation, and maintenance of high performance geomembranes, floating covers, and specialty geosynthetics. We work with end users, consulting engineers and contractors to deliver products and services that protect the environment. Layfield Environmental Containment has strategic locations across North America and internationally.

Latest News

Advanced Test Reactor (ATR) Complex Warm Waste Pond Liner Replacement

October 24, 2016

LOCATION:  Idaho National Laboratory, Idaho

TIMEFRAME: Phase One Summer 2016 with Phase Two in the Spring Of 2017

SCOPE OF WORK: Warm waste pond liner replacement. Construction of Sand Bag Berm, Double 45 Mil CSPE Liners, Nonwoven Geotextile & Geocomposite Layers Including Appurtenances, Radiation II Training

PROJECT PARTNERS: Owner: US Government – Battelle Energy Alliance, LCC (BEA) General Contractor: C&H Construction Company INC. Engineer: JUB & Walsh Installation and Materials Supplier: Layfield USA


read more