Oil Pit Liner

Oil pits, reserve pits, and drilling sumps are typically used to store fluids and mud produced by the drilling process. These fluids can be highly contaminated with salts or chemicals and require an impermeable geomembrane barrier.

Layfield offers a variety of highly flexible, prefabricated, durable geomembranes that meet or exceed current containment standards. Enviro Liner® 3000 (only available in the US) in 20 and 30 mil thicknesses is an economical lining material made from blended/reprocessed resins for optimum performance at the lowest cost. Enviro Liner® 4000 in 20, 30, and 40 mil thicknesses has excellent chemical resistance, flexibility and UV resistance. Enviro Liner® geomembranes can be factory fabricated, allowing us to mobilize very large, one-piece pit liners and often eliminating the need for field welding or site fabrication.

Layfield Environmental Containment provides engineering, design, construction (installation), and maintenance services of many types of geosynthetics products with a focus on geomembrane liners and floating covers. We have one of the largest, most experienced installation crews in North America. Use the links in the menu below to view the products and services available for this application and to access other applications.

close menu
"Thank you for doing the extra on the shipment of textiles." Marian, Northern Mining Company

Request For Quote

Tell us a little bit about your needs and we'll get right back to you with specific pricing. 

Get a full introduction to Layfield services with a Lunch & Learn session.
Contact us today 

About Environmental Containment

Layfield Environmental Containment is a vertically integrated company involved in the manufacturing, fabrication, installation, and maintenance of high performance geomembranes, floating covers, and specialty geosynthetics. We work with end users, consulting engineers and contractors to deliver products and services that protect the environment. Layfield Environmental Containment has strategic locations across North America and internationally.

Latest News

Advanced Test Reactor (ATR) Complex Warm Waste Pond Liner Replacement

October 24, 2016

LOCATION:  Idaho National Laboratory, Idaho

TIMEFRAME: Phase One Summer 2016 with Phase Two in the Spring Of 2017

SCOPE OF WORK: Warm waste pond liner replacement. Construction of Sand Bag Berm, Double 45 Mil CSPE Liners, Nonwoven Geotextile & Geocomposite Layers Including Appurtenances, Radiation II Training

PROJECT PARTNERS: Owner: US Government – Battelle Energy Alliance, LCC (BEA) General Contractor: C&H Construction Company INC. Engineer: JUB & Walsh Installation and Materials Supplier: Layfield USA


read more