Soil Remediation Solids Containment

Layfield provides liners to put underneath contaminated soils for soil remediation applications. The liners can be used for either temporary or long term remediation with the long term use normally using a heavier lining material. Layfield also can provide covers, polyethylene film, and other geosynthetics that are commonly used in soil remediation applications. Layfield’s featured product for soil remediation is our OR RPE 25 geomembrane. This light weight, low cost material is ideal for temporary containment of contaminated soils. 

The oil resistant cover material of OR RPE 25 is resistant to a range of contaminants and is strong and light to withstand installation. Layfield also supplies lighter weight RPE materials for covers so that soils can be protected from rain during storage. For permanent soil treatment we also install heavy weight lining systems and double lining systems as are required in some jurisdictions.

close menu
"Thanks a lot for getting that grid out on Saturday! Sorry for the trouble, but your effort is appreciated! It's why we deal with Layfield." Mick, Oilfield Remediation & Reclamation Services Company

Request For Quote

Tell us a little bit about your needs and we'll get right back to you with specific pricing. 

Get a full introduction to Layfield services with a Lunch & Learn session.
Contact us today 

About Environmental Containment

Layfield Environmental Containment is a vertically integrated company involved in the manufacturing, fabrication, installation, and maintenance of high performance geomembranes, floating covers, and specialty geosynthetics. We work with end users, consulting engineers and contractors to deliver products and services that protect the environment. Layfield Environmental Containment has strategic locations across North America and internationally.

Latest News

Advanced Test Reactor (ATR) Complex Warm Waste Pond Liner Replacement

October 24, 2016

LOCATION:  Idaho National Laboratory, Idaho

TIMEFRAME: Phase One Summer 2016 with Phase Two in the Spring Of 2017

SCOPE OF WORK: Warm waste pond liner replacement. Construction of Sand Bag Berm, Double 45 Mil CSPE Liners, Nonwoven Geotextile & Geocomposite Layers Including Appurtenances, Radiation II Training

PROJECT PARTNERS: Owner: US Government – Battelle Energy Alliance, LCC (BEA) General Contractor: C&H Construction Company INC. Engineer: JUB & Walsh Installation and Materials Supplier: Layfield USA


read more