Skip to content

This site uses cookies, you can find more information about the data we collect on our Privacy Policy page.

Accept
  • Layfield Group
  • Geosynthetics
  • Flexible Films
  • Solutions
    • Aquadam® Flood Control/Cofferdam
      Overview Products
    • Environmental Containment
      Overview Products
    • Erosion Control
      Overview Product
    • Floating Covers
      Overview Products
    • Industrial Fabrics
      Overview Products
    • Installation & Maintenance
      Overview Products
    • Stormwater Solutions
      Overview Products
    • Sediment Control
      Overview Products
    • Soil Reinforcement
      Overview Products
    View All Products
  • Applications
    Applications Overview
    • Agriculture
    • Drought Solutions
    • Flood Control
    • Mining
    • Oil & Gas
    • Solid Waste Management
    • Water and Waste Water
  • Resources
    Resources Overview
    • Technical Hub
    • Knowledge Center
    • Webinars
    • Case Studies
    • Video Hub
    • Drawings
  • About
    About Geosynthetics
    • Manufacturing
    • Construction Services
    • Sustainability
    • Certifications and Affiliations
  • Contact

Search

  • Solutions
    • Aquadam® Flood Control/Cofferdam
      Overview Products
    • Environmental Containment
      Overview Products
    • Erosion Control
      Overview Product
    • Floating Covers
      Overview Products
    • Industrial Fabrics
      Overview Products
    • Installation & Maintenance
      Overview Products
    • Stormwater Solutions
      Overview Products
    • Sediment Control
      Overview Products
    • Soil Reinforcement
      Overview Products
    View All Products
  • Applications
    Applications Overview
    • Agriculture
    • Drought Solutions
    • Flood Control
    • Mining
    • Oil & Gas
    • Solid Waste Management
    • Water and Waste Water
  • Resources
    Resources Overview
    • Technical Hub
    • Knowledge Center
    • Webinars
    • Case Studies
    • Video Hub
    • Drawings
  • About
    About Geosynthetics
    • Manufacturing
    • Construction Services
    • Sustainability
    • Certifications and Affiliations
  • Contact
Home > resources > case studies > norco bluffs phase 2 toe protection rs580i solution

Norco Bluffs Phase 2 Toe Protection – Mirafi® RS580i Solution

Soil Reinforcement March 11, 2025
  • Share
  • Share on Facebook
  • Share on X
  • Share on LinkedIn

PROJECT SUMMARY

For the Norco Bluffs Phase 2 Toe Protection project in Santa Ana, California, an earth fill was required to be placed against the existing bluffs, approximately 7,330 feet in length. This embankment is revetted with riprap slope protection and a launchable stone toe blanket. This project will tie into existing high ground at the upstream (Station 90+20) and downstream (Station 19+90) project extents. The embankment fill will raise the grade between 12 and 25 feet above the existing grade to provide protection for up to a 100-year flow event water surface elevation (WSE). The proposed embankment slope is 2H:1V and is revetted with riprap slope protection 42 inches thick, measured perpendicular to the slope face. The expected scour is between 5 and 14 feet below the existing thalweg (between 6 and 19 feet below the existing grade at the project alignment). Excavation is planned to reach 2 feet above the typical groundwater, averaging 5 feet below the existing grade, to eliminate the need for dewatering. A launchable stone toe is intended to provide protection from scour, with the stone toe being 9 feet high and varying in width between 10 and 30 feet, depending on the expected scour depth along the project alignment.

SOLUTION

The contractor, Griffith, faced a challenge when quicksand conditions were encountered during preliminary work in 2019. A track-mounted drill rig and a track support vehicle were used for the work. After the completion of the last boring, the Morooka became stuck in loose, saturated sand, where the groundwater level was very close to the surface. Despite several attempts to free the vehicle, including towing with a D-4 and D-6 dozer and excavation around the vehicle, the excavation only caused the vehicle to sink deeper into the saturated sand, creating a large void that filled with groundwater, essentially trapping the equipment in quicksand.

Layfield was contacted and was able to provide 50 rolls of Mirafi® RS580i and another 50 rolls of FW300. The Mirafi® RS580i material provided superior reinforcement strength, soil interaction, high water flow, and soil retention capabilities. The material was laid directly on the roadbed, with backfill placed directly on top, allowing trucks to drive over the area without sinking. The FW300 geotextile was used for the slopes as per the project design.

CHALLENGES & RESULTS

The main challenge of the project was dealing with the quicksand conditions encountered during the preliminary work, which caused the Morooka to become stuck in the saturated sand. Despite multiple attempts to remove the vehicle, excavation worsened the situation. The solution provided by Layfield’s Mirafi® RS580i material enabled the contractor to continue the project without further complications. The reinforcement allowed heavy machinery to safely drive over the roadbed and slopes, ensuring the project proceeded smoothly and without further delays.

 

Find the Product You Need? Reach out to Our Team.

Click the link below to get in touch with us, and our team will get back to you promptly.

Request a Quote Ask an Expert
  • Facebook
  • Youtube
  • Linkedin
  • Layfield Corporate
  • Sustainability
  • About Layfield Group
  • Careers
  • Contact Us
  • Layfield Geosynthetics
  • Our Solutions
  • Applications
  • Resources
  • About Layfield Geosynthetics
  • Knowledge Center
  • Layfield Flexible Films
  • Our Markets
  • Resources
  • About Layfield Flexible Films
  • Sustainability
Contact
CAN:
(800) 840-2884
US:
(800) 377-8404
Email
[email protected]
© Layfield Group Ltd. 2025
  • Terms and Conditions
  • Privacy Policy
  • Accessibility Statement
  • Sitemap
Launched by Major Tom