Prevent the Release of Sediment from Your Construction Site
Every construction site is unique and has its own set of sediment control challenges. Layfield has assembled a range of products to help you take control, avoiding costly fines or downtime while protecting the environment. We can also help you prepare your construction site sediment control plans with advice and data on the latest in best management practices (BMPs).
Sediment Control In Action
View All Case Studies
Custom Built Type 4 Turbidity Curtain for John Hart Dam Seismic Upgrade Project
Temporary Floating Barrier-IP Park
Crowe Dam Rehabilitation - Lock 14 Turbidity Barrier
Sediment Control In The News
View All News
May 20, 2026
News Release: Layfield Awarded Garvey Reservoir Contract for Geomembrane Relining and Floating Cover Installation
Read Article
May 14, 2026
NEWS RELEASE: Layfield Celebrates 10th Consecutive Year as One of Canada’s Best Managed Companies
Read Article
March 23, 2026
Protecting Water with Geomembrane Floating Covers
Read Article
January 20, 2026
Stormwater Impacts: Challenges for Urban Development
Read Article
December 2, 2025
From Flowback to Sustainability: Geomembranes for Produced Water Driving Change in Upstream Oil & Gas
Read Article
October 21, 2025
Flow Smarter: How Baffle Curtains Boost Water Treatment Efficiency
Read Article
October 1, 2025
Layfield Technology Powers World-Class Containment at BHP Olympic Dam
Read Article
September 3, 2025
Technical Series: Beneath the Surface: Solving Waterproofing Challenges with Geomembranes
Read Article
July 2, 2025
Layfield Presents Technical Papers at GeoAsia8 2025
Read Article
May 20, 2025
Raising the Bar for Geonet Innovation and Performance
Read Article