Vertical Pile Penetration Boot Detail

Vertical Pile Penetration Boot Detail
 
A sleeve of geomembrane is made to transition between the base of a containment and a vertical pile or pipe. The sleeve is then clamped to the pile with a suitable gasket or sealant under the clamp. The body of the pile boot is welded to the geomembrane.